Hardwood floors can last a long time, but eventually they need to be replaced. Luckily, it's a pretty straightforward process! Use a circular saw to cut the old hardwood into pieces, then remove the old flooring. Prepare your subflooring so that it's clean and perfectly level. After that, choose your replacement flooring and follow the process for installing that particular type of hardwood! Denver Hardwood Floor Install
Awesome explanation! When I say heat pump to people, it's amazing how often their eyes glaze over...even though most of them have had refrigerators and air-conditioners their whole lives and have never asked themselves how they work. Same principle! Compressor and expansion valve (and the heat-holding capacity of a phase change; another confusing one for people). thanks for helping educate! Denver Hardwood Floor Install
The natural process of things will tend to close gaps as the weather and humidity changes. As a rule, if the gap is less than the thickness of a dime, your flooring is normal and there’s nothing to worry about. If your gaps are more persistent, you might need to call in a professional to tighten up your hardwood floor so that they cease to be a problem. Denver Hardwood Floors

Cupped floors, also called washboarding, develops gradually across the width of the wood strip where the edges of the hardwood planks raise up and the center of the board sinks down. The cause of cupped floors is a moisture imbalance where there is more water on the bottom side of the wood plank than on the top. The only cure is to balance the humidity levels in your home, and to give the surface time to return back to normal. After the floor has stabilized, you can have a professional sand it flat and re-finish it to perfection. Hardwood Floors

Glue down engineered hardwood, alternatively. If you don't want to nail down the boards, you do have the option of using adhesive to put engineered hardwood in place. It's a good choice, but won't last as long or be as sturdy as nailed down hardwood. The procedure is very similar to the nail-down process. Follow the adhesive manufacturer's instructions for installation and drying times.[11] Denver Hardwood Floor Install
Installing new solid or engineered hardwood flooring will add value and elegance to your home. Although they offer the same timeless look and sense of warmth, engineered hardwood and solid hardwood do offer a few key differences. For example, engineered hardwood is manufactured from three or more layers of fiberboard, and a real hardwood veneer top layer. Contrastly, solid hardwood is milled from a real hardwood species, making it the sole material used in this type of flooring. Learn more differences here! Denver Hardwood Flooring
Floor connection system: There are a wide range of connection systems, as most of them are mill-specific manufacturing techniques. The general principle is to have grooves on all four sides of the plank with a separate, unconnected, piece that is inserted into the grooves of two planks to join them. The piece used for the connection can be made from wood, rubber, or plastic. This installation system allows for different materials (i.e. wood and metal) to be installed together if they have the same connection system. Denver Hardwood Floor Install
Cut a new length of flooring to fit snugly into the space of the old board. It doesn't matter what kind of saw you use to repair your hardwood floors; just make sure the cuts are perfectly square. After trimming the board to length, turn it upside down and use a chisel to chop off the lower lip of the grooved edge (photo 5). That allows it to fit over the protruding tongue of the adjacent floorboard. Test-fit the new piece. If it's slightly lower than the surrounding floorboards, shim it up with strips of kraft paper. Then remove the board and spread carpenter's glue on the tongues and grooves of the new and old pieces. Slip the new board into place (photo 6), protect it with a scrap-wood block and tap it down with a hammer. Cover the board with wax paper, then hold it down overnight with heavy books or weights. An alternative to gluing: Simply face-nail the board with 6d finishing nails. Bore pilot holes at a slight angle, then drive in the nails. Tap them below the surface with a nailset (photo 7) and fill the holes with wood putty. Lightly sand the entire board smooth, but be careful not to remove too much finish from surrounding boards. After finding a matching stain color by experimenting on scraps of flooring, stain the boards to match the original floor. Let dry overnight, then apply two coats of clear polyurethane varnish. If the old floor is unstained, just apply the polyurethane. Hardwood Floors
Generally, hardwood floors need to be buffed every 3–5 years. The process usually takes about one day. Buffing refers to the process of using a stand up floor buffer. The floor is abraded with 180 grit screen on the buffer. This allows for the new coat of finish to mechanically adhere to the floor. This process works with great results as long as the floor hasn't had any waxes or synthetic cleaners. Denver Hardwood Floors

Refinishing can actually take much more time than fully replacing a wood floor. Refinishing is a messy, meticulous process than can take approximately four to five days, during which the floor surface must remain completely untouched. The process requires sanders, edgers, buffers, scrapers, brushes, base coat sealers, topcoat sealers, putty knives and sometimes paint. Replacement, on the other hand, can be done in considerably less time using only lumber, a couple of saws, measuring tape, a flat bar, a chalk line and a nail gun.
Awesome explanation! When I say heat pump to people, it's amazing how often their eyes glaze over...even though most of them have had refrigerators and air-conditioners their whole lives and have never asked themselves how they work. Same principle! Compressor and expansion valve (and the heat-holding capacity of a phase change; another confusing one for people). thanks for helping educate! Hardwood Floors
If your floors are in need of a deeper cleaning, use a wood floor cleaner. Follow the instructions for diluting the cleaner in water. Clean the floors with a damp mop, going with the grain. Then, go back over the floor with a clean, damp mop to remove any excess cleaner. Finish by drying the floor completely with a dry towel. Remember, leftover standing water could damage your wood floors. Denver Hardwood Floors
To fix a buckled floorboard, you need to be able to access the floor from below. The way to tackle this problem is to put weight on the buckled area from above — a cement block works well. Then install a 1 1/4-inch screw in the buckled flooring from below. Allow the screw to penetrate only halfway into the flooring, or it may come up through the finished surface. Driving the screw through the subfloor and into the flooring pulls the flooring down against the subfloor and gets rid of the buckled spot. Hardwood Floors
×