Most floors use a tongue-and-groove design for connecting adjacent strips. This design makes replacing a single strip or plank challenging, but not impossible. First, look for any nails in the damaged board and drive them as far through the board as possible by using a hammer and nail set. Carpenters use nail sets to drive nails flush with trim without damaging the trim with a hammer. After you’ve cleared the nails, it’s time to remove the damaged board and install a new one. Follow these steps: Hardwood Floors
×